Article Contents:
- Wooden frame RM-052: what we record for all three fitting rooms
- Large mirror frame: checking each fitting room separately
- Wooden frame size and mirror panel size are two different tasks
- One finish sample for three wooden frames
- Price of three RM-052 and a full estimate for mirrors for the store
- Frames in stock and mirrors for opening are not the same date
- Frame and wooden baseboard of the fitting room: coordinate the bottom joint
- Acceptance of three frames before installing mirror panels
- Order wooden frames RM-052: two specifications instead of a general comment
- Questions before purchasing frames for fitting rooms
- Is the mirror glass included in the price of RM-052?
- Can I order glass according to the overall frame dimensions?
- Will the selected format be suitable for a full-length reflection?
- Can I order three identical frames?
- What to do if only two frames are in stock?
- Does "Prestige" mean ready-made painting?
- What costs should be added to the price of three frames?
- Who determines the mounting of the mirror to the wall?
Three identical frames do not yet mean three finished mirrors. Opening a store requires coordinated mirror panels, completed finishing, fittings, and installation in each fitting room. For the selected large version, three beech frames cost 73,950 RUB, and three oak frames cost 96,780 RUB as verified on September 5, 2026. These are only the frames; the price of the finished set is determined after agreeing on the remaining items.
Let's consider a hypothetical situation: a clothing store owner equips three fitting rooms and chooses one wooden frame for them. The goal is to achieve a uniform appearance without unexpected surcharges for operations that each party considered someone else's responsibility. This is an example of order organization, not a description of a completed project.
The project has three different readiness points: order placed, set received, mirrors installed. Between them may lie panel manufacturing, painting, assembly, and several transports. Before paying for the frames, it is useful to determine who will bring each item to a state in which the store's customer can use it.
Wooden frame RM-052: what we specify for all three fitting rooms
For the order in question, the version 1900 × 800 × 43 × 33 mm, designated by the manufacturer as A × B × C × D, is selected. It can be buy a wooden frame RM-052 from beech or oak; in the size chart for both materials, the "Prestige" sanding finish is specified. These parameters were re-checked in the product card on September 5, 2026.
The request requires one agreed configuration for three pieces. The material cannot be left to the picker's discretion: two beech frames and one oak frame do not become a matching set due to a shared article number. For the batch, the quality of the blank for the intended coating is also fixed. The available finish should be confirmed with the seller, without automatically transferring settings from another size position.
The working line looks like this: "RM-052, 1900 × 800 × 43 × 33 mm, beech or oak — one selected material for the entire batch, "Prestige", blank quality per confirmed specification, 3 pcs.". If the decision changes, the entire line is updated, rather than adding "the last one can be different" in correspondence.
Next, a checklist of the finished mirror is compiled. It shows which issues are not yet resolved by the purchase of the wooden product.
| Part of the finished mirror | What to coordinate | Who is responsible |
|---|---|---|
| Frame | Article number, finish, quantity, set contents | Frame seller |
| Mirror panel | Size, characteristics, treatment | Mirror manufacturer |
| Wood finishing | Sample, color, gloss, scope of work | Selected finisher |
| Canvas retention and back part | Accepted design and components | Assembly contractor |
| wall mounting | Diagram for the full product and specific base | Installer |
The table does not assert that all listed items are sold separately: some may be included in one contractor's proposal. But opposite each one, a responsible and clear delivery scope should appear. If a workshop handles the canvas, assembly, and mounting, that is a convenient combination of work. It becomes a project condition only after confirmation, not by default.
Large mirror frame: check each fitting room separately
Label rooms P-1, P-2, and P-3. Even with identical dimensions on the plan, their finished walls, door positions, hooks, and seats may differ. Measuring one booth does not replace inspecting the others. It is especially easy to miss an obstruction where the door opens in the other direction or the curtain is gathered near the future mirror.
On the development of each wall, draw the outer contour of the frame and the desired mark of its lower part from the finished floor. Nearby, show the baseboard, switches, hooks, seat, and light fixtures. On the floor plan, mark the place for a person in front of the mirror and the space for opening the door or moving the curtain. The dimensions of the wooden frame are checked together with the furnishings, not on an empty wall rectangle.
For a preliminary fitting, you can make a lightweight full-size template of the outer contour. It helps to see whether the frame interferes with using a hook or sitting down. However, a paper mock-up does not confirm the reflection: the boundaries of the visible mirror opening need to be obtained separately, and then the placement should be checked with the mirror installer.
| Fitting room | Installation location | Wall base | Adjacent elements | What to coordinate |
|---|---|---|---|---|
| P-1 | According to the measurement diagram | After inspection | According to the actual layout | Height and position |
| P-2 | According to a separate scheme | After inspection | According to the actual layout | Height and position |
| P-3 | According to a separate scheme | After inspection | According to the actual layout | Height and position |
Such a list should not remain formal. Before launching the order, general entries are replaced with actual values, photos, and a decision for each cabin. If one wall is not yet finished, its measurements are marked as preliminary.
The external height of the frame does not guarantee a full-length reflection. What matters is the visible opening and the position of the mirror relative to the user. An inconvenient placement cannot be corrected by requiring a person to always stand in a single awkward spot. The check is performed in the usual fitting room environment, with its door, seat, and lighting.
When the selected configuration does not suit at least one room, it is better to reconsider the choice and to buy a mirror frame after checking the entire scheme, rather than ordering a triple in hopes of figuring it out during installation. For an artistic solution, you can order a design project with RM-052 frames. The scope of this service is clarified separately: a decorative specification does not replace the mirror panel mounting project.
Our factory also produces:
The size of the wooden frame and the size of the mirror panel are two different tasks
In a mirror order, three contours should be distinguished. The external dimension is needed for placing the frame on the wall. The visible opening determines the exposed reflective part. The mounting seat refers to installing the panel into the structure. One size cannot be substituted for another.
The numbers 43 and 33 mm in the RM-052 designation do not provide a basis for subtracting them twice from 1900 and 800 mm. Without a drawing with a breakdown, such an action would be a guess. The published dimension table does not establish the mounting dimensions, allowable thickness, and retention scheme required for ordering glass. A reference to a drawing by itself also does not replace the agreed document of the selected configuration.
Before the mirror manufacturer begins cutting, provide them with the drawing of the large RM-052 specifically and ask them to confirm the finished panel size along with the mounting conditions. If the documentation is insufficient, coordinate the measurement of the received frames. The possibility of ordering glass in parallel before the wood arrives is determined by the completeness of the data, not by the desire to speed up the opening.
| Parameter | Who confirms | Document | Can manufacturing be launched |
|---|---|---|---|
| Frame mounting dimensions | Manufacturer or measuring contractor | Drawing or measurement sheet | Not known yet — no |
| Finished panel size | Mirror manufacturer together with assembler | Agreed order | After landing check |
| Web thickness and treatment | Mirror manufacturer | Web specification | After design approval |
| Retention method and components | Assembly contractor | Joint diagram | After compatibility confirmation |
| Total weight and wall mounting | Assembler and installer | Product data and installation diagram | Before installation at the site |
An unknown value in such a table is left blank. The entry "clarify before cutting" is more useful than an approximate number that another participant will take as confirmed. Next to the document, indicate the date and version: after a design change, all performers must work from one revision.
Even for identical frames, agree on how the entire set of three is checked. This is not a statement about the size spread of RM-052, but a batch control procedure. The assembler must confirm the compatibility of each received panel with the frame intended for it. When products are already distributed among booths, preserve their designations when transferring between workshops.
For a retail space, separately ask the manufacturer about the safe execution of the mirror panel and its fixation. Do not assign thickness, film, or a set of holders on your own based on someone else's example. All chosen solutions must be included in the specification so that the installer receives a full description of the product, not just the dimensions of the wooden part.
Get Consultation
One finish sample for three wooden frames
Identical finishing starts with an approved sample, not with three messages saying "paint in warm white." Record the color, gloss level, acceptable type of wood grain, and treatment of visible side surfaces. Check the sample under store lighting: that is where the owner will accept the result.
STAVROS separates quality of wood and sanding. The designations "under enamel" and "under tinting" refer to the selection of lamellas of the blank. "Prestige" describes surface treatment, including detailed hand sanding, but does not specify the final color. This inscription cannot be considered confirmation of an already applied coating.
For opaque finishing, agree on how much the base structure should be visible. For semi-transparent, compare acceptable differences in wood grain. Three products made of natural wood should not be ordered as photographically identical copies: the manufacturer explicitly allows tonal differences within a batch even when executed under tinting.
A practical way to agree is a coating sample on the selected material. When the entire item needs to be seen, the first one can be a single paid frame. Before its separate purchase, find out the delivery procedure for the other two. Sample checking should not end with the agreed execution no longer being available in the required quantity by the required date.
If the first frame passes inspection and is included in the set, the remaining need is two pieces. If it is reworked or not used, these costs do not disappear from the budget. No free test sample should be included in the calculation without a separate offer from the seller.
Before finishing, coordinate with the assembler how to handle mounting surfaces. The specification must clearly indicate which areas are processed, which are protected, and when the panel can be installed. Do not assign the coating technology yourself: the contractor must preserve the accepted design and prepare the surface for the selected material system.
Keep the approved sample until all three frames are accepted. A photo is convenient for correspondence but should not inadvertently become the sole reference for color and gloss. After approval, do not change the coating of one item without checking how the entire batch will look.
Price of three RM-052 and full estimate of mirrors for the store
Cost of selected configurations in RM-052 card re-verified on September 5, 2026. The table calculates only frames 1900 × 800 × 43 × 33 mm with "Prestige" sanding, without an assumed quantity discount.
| Material | One frame | Three frames |
|---|---|---|
| Beech | 24 650 ₽ | 73 950 ₽ |
| Oak | 32 260 ₽ | 96 780 ₽ |
The difference for the entire set is 22,830 ₽. It applies to wooden products, not to the three installed mirrors. Choosing a more expensive material does not cover the costs of glass, finishing, and on-site work.
Base formula of the full estimate:
3 × frame price + 3 × panel price + finishing of three frames + agreed components + delivery + installation.
Assembly is included as a separate line if it is not part of the mirror manufacturer's or installer's offer. The same applies to measuring, coating samples, and additional packaging. Each operation must be accounted for once: omissions and double counting distort the budget equally.
| Expense item | How to account for it |
|---|---|
| Three frames | According to the selected design and confirmed invoice |
| Three mirror panels | According to the manufacturer's specification |
| Sample and finishing | According to the agreed scope of work |
| Retaining elements, backing, hanging hardware | Only necessary items not previously included |
| Assembly | Separately or within an agreed service |
| Transportation and packaging | Along the actual route between contractors |
| Installation of P-1, P-2, and P-3 | Based on the basis and conditions of each fitting room |
For unknown lines, use the status 'calculation requested' rather than zero cost. Zero means no expense or confirmed inclusion in another service. Lack of response from the workshop does not imply this.
There is a significant condition regarding coverage: in official responses from STAVROS painting is specified when ordering products from 150,000 ₽. Both orders under consideration, out of three frames, are below this amount. Therefore, factory painting cannot be promised within the given budget. The finishing contractor, cost, and availability of the service must be agreed upon separately; purchasing unnecessary items to meet the threshold is not required.
Compare quotes of equal readiness. One may include only glass manufacturing, another — a panel with processing and frame installation. A lower "mirror" line does not necessarily mean a smaller project total. Ask for the included operations to be stated directly in the commercial proposal.
For different walls, use three installation lines instead of unconditionally multiplying a single rate. General delivery, on the other hand, should not be automatically tripled. After filling out the estimate, you can calculate the average cost of one finished fitting room by dividing the total by three, but this figure does not replace the calculation of actual expenses per room.
You can check the spending limit without invented rates. Suppose the owner set a conditional limit of 120,000 ₽ for all three mirrors. After purchasing beech frames, 120,000 − 73,950 = 46,050 ₽ will remain for other items; after purchasing oak frames, 120,000 − 96,780 = 23,220 ₽ will remain. This is the available budget remainder, not an estimate of glass or installation costs. Collected quotes must be compared against it. If they do not fit, change the agreed project scope or the limit; necessary mounting must not be excluded from the estimate just to achieve a nice final figure.
The full price will only be known after receiving quotes for unfilled items. Until then, a correct budget contains the confirmed cost of frames and a list of works awaiting calculation, not an attractive but incomplete "turnkey" sum.
Frames in stock and mirrors by opening — not the same date
In the same check, the card showed two beech and five oak frames of the selected size in Saint Petersburg. For the beech set, one piece is missing. For oak, the displayed quantity is arithmetically sufficient, but this is a snapshot of stock, not a batch reserved for the store.
Do not fill a missing item with the assumption "while we paint two, the third will surely be delivered." First, request confirmation of the full quantity and agree on whether reservation is required. The payment date itself does not indicate when all three items can move to the next stage.
If there is a shortage, several reasonable solutions exist. You can agree on the arrival of the missing frame, choose one different finish for the entire trio after re-approval, or change the work schedule. Automatically switching to oak just because it is available is not advisable: the material is tied to the finish sample and increases the product cost.
It is more convenient to build the calendar backward from the required readiness date. Installation and acceptance must be completed before opening. Before installation, the finished set must be at the site. Before transport, assembly, finished panels, and completed finishing are needed. Receiving frames and approving technical data come earlier than these operations.
However, not everything must be done sequentially. Wall preparation can run in parallel with finishing, and panel manufacturing can run in parallel with painting, if dimensions and design are already confirmed. The possibility of such overlap is agreed by the contractors. A made-up timeline of "three days for everything" does not replace their answers.
| Set | Confirmed | Frame received | Finishing completed | Mirror assembled | Installed |
|---|---|---|---|---|---|
| P-1 | Date / responsible person | Date | Date | Date | Date |
| P-2 | Date / responsible person | Date | Date | Date | Date |
| P-3 | Date / responsible person | Date | Date | Date | Date |
This is a draft of a work log, not information about a completed delivery. An empty cell means that the stage has not been confirmed yet. Such a record replaces the phrase "mirrors are almost ready" with a specific question: what exactly remains at P-3 and who is completing the work.
Review payment and delivery terms and specify the correct first recipient. It may be a workshop, not a store. Agree in advance on further transportation, the place of acceptance, the contact person in charge, and the possibility of bringing packaged items inside. The cost of frame delivery cannot be considered payment for all subsequent movements of finished mirrors.
If frames, glass, and finishing are handled by different companies, appoint one coordinator on the customer's side. They keep current documents and confirm the transfer of sets between stages. This is especially useful when acceptance at the site is performed by an employee who did not participate in choosing the coating.
Frame and wooden baseboard of the fitting room: coordinate the bottom junction
The position of the lower part of RM-052 is checked against the finished wall finish. The baseboard may protrude from its plane, so the diagram needs not only a front view but also a side section. The frame must not be automatically lowered to the floor, nor should the existing profile be considered a base on which the mirror will stand.
If the lower zone conflicts with the baseboard, the decision is made together with the installer: the agreed mark, location, or junction design is changed. Arbitrarily tilting the frame to bypass the protrusion alters the original installation scheme. Decorative trim does not become a load-bearing support without an appropriate structural solution.
A functional existing profile does not have to be replaced. When baseboards are part of the store's new finish, it is possible to buy wooden baseboard and compare samples of its coating with the frames. This purchase is considered separately: it relates to room decoration, not to the mandatory RM-052 configuration.
Acceptance of three frames before installation of mirror panels
The first inspection is carried out before the frames are handed over for finishing. Compare the article number, full size, material, finish, and quantity with the order. Inspect the front surface, corners, accessible back side, and areas of future panel junction. Any discovered features are best discussed with photos before starting subsequent work.
In the section "acceptance conditions and warranties" STAVROS states that upon delivery, the number of cargo units should be verified and packaging checked; identified violations are documented with the participation of the carrier's representative. However, the number of boxes does not necessarily equal the number of frames. Both checks are needed: cargo units per transport documents and items per product specification.
Do not send a frame with an undetermined damage directly to painting. Otherwise, when discussing the cause, you will have to separate the condition after transportation, processing, and assembly. Handing over each workshop with a brief note about the product's condition helps maintain a clear sequence of work.
The next inspection is after finishing and installing the panels. Compare all mirrors with the coating sample, check the completeness according to the accepted scheme and marking. If the P-2 mounting differs due to the wall, its parts should not end up in the P-1 packaging. An identical front part does not mean interchangeability of all mounting kits.
The installer is provided with information about the full structure and weight of the finished mirror, as well as data about the base. Choosing a mounting based on one size of the wooden frame is insufficient. Do not pre-assign a universal number of dowels, arbitrary load capacity, or installation "on any mounting adhesive." Free leaning against the wall also cannot be declared as a standard method of using RM-052.
The final check takes place in each fitting room: the position corresponds to the agreed scheme, the door or curtain moves without contact, access to hooks and the seat is preserved, and the mirror can be used from the intended location. The method of checking the mounting itself is determined by the contractor; there is no need to test the product with random jerks.
Ask to provide care instructions for the finished combination of glass and coating. A product for the mirror surface should not be automatically assigned for the wooden frame. The instructions must take into account the specific finish, not just the name of the wood species.
Order wooden frames RM-052: two specifications instead of a general comment
Before payment, prepare two related documents. The first describes the product being purchased. The second describes the result that the workshops and the installer must deliver. This separation allows you to understand which part of the project is already ordered and for which there is still no contractor.
Request for frames:
RM-052 / 1900 × 800 × 43 × 33 mm / material ___ / "Prestige" sanding / confirm blank quality / 3 pcs. All products are of one agreed execution. Confirm the configuration, current price, availability of the entire quantity, readiness for shipment, packaging, and delivery. First recipient ___, contact of the responsible person ___.
Task for finished mirrors:
Fitting rooms P-1, P-2, and P-3. Dimensions and characteristics of the panels — according to the agreed drawing or measurement sheet, version ___. Color and gloss of the frames — according to the approved sample ___. Components and mounting — according to the accepted scheme for each room. Responsible for manufacturing panels, finishing, assembly, transportation, and installation ___. Required date of full readiness ___. Composition and cost of work to be specified separately.
Attach measurement diagrams of the fitting rooms and photos of installation sites to the documents. Indicate which information is final and which depends on the completion of wall finishing. This will prevent a situation where a preliminary sketch without warning becomes the basis for manufacturing.
Each contractor's proposal must have clear boundaries. The phrase "manufacturing of mirrors" requires clarification: only panels, panels with assembly, or the entire set with installation. A frame seller cannot be credited with equipping fitting rooms entirely if such a scope of work is not confirmed.
Manufacturing of panels is not started until their dimensions and design are agreed upon. Frames can be received earlier for measurement if such a procedure is accepted by project participants. The purchase of the batch itself should be postponed when at least one booth has not been checked, an acceptable installation method has not been determined, or the required quantity does not fit into the confirmed schedule. After resolving these issues, you can order wooden frames RM-052. Before payment, check the current price and completeness again: the store's task ends with three accepted mirrors, not three paid product items.
Questions before purchasing frames for fitting rooms
Is the mirror panel included in the price of RM-052?
It should not be considered included without confirmation of the configuration. Ask to list the contents of the product item in the invoice or attachment. A photo of the frame with a reflective surface does not replace such a record. If the panel is included in an individual offer, also check the processing, assembly, and conditions for transferring the finished product.
Can glass be ordered according to the overall frame dimension?
No, a coordinated size of the finished panel is needed for a specific fit. When handing over the order to the glazier, separately indicate where the outer contour is and where the manufacturing data is. This reduces the risk that the correct number from the card will be used for the wrong part.
Will the selected format be suitable for a full-length reflection?
This is checked against the visible opening and placement in each fitting room. Assess the user's usual position, not just the beautiful frontal view of the wall. If the desired result is achieved only by moving the seat or opening the door, the initial layout is not yet coordinated.
Can three identical frames be ordered?
Yes, the request may include three items of the same execution, but the seller must confirm the supply of the entire quantity. The same article number does not replace the match of size, material, and preparation. For the appearance of the finished batch, a single coating sample is additionally needed, not three independent tasks.
What to do if there are only two frames in stock?
Before starting dependent work, coordinate the third item and the readiness date of the set. Purchasing two is only suitable if the schedule for the remaining supply is accepted. If the date is unknown, consider another unified execution or revise the readiness date, without masking the shortage with a mixed batch.
Does "Prestige" mean finished painting?
No. This is a surface treatment characteristic. For acceptance of a painted item, separate information about the coating and the reference sample is needed. The wording "color as on the website" also does not define a finished finish: confirm a specific sample, gloss, and scope of work before handing the batch to the finisher.
What costs should be added to the price of three frames?
Fabrics, finishing, necessary components, assembly, transportation, and installation, if they are not included in other line items. Clarify the fate of costs for the sample and measurement. The full estimate should show both upcoming and already paid operations, without double-counting a single service.
Who determines the attachment of the mirror to the wall?
The installation contractor determines it based on data about the finished product and the actual base, taking into account the agreed design. They must receive information from the assembler before installation. If walls differ, solutions may vary, so installation documentation and components are kept separately for P-1, P-2, and P-3.