Two wardrobes have the same width — 2.4 metres. The first is designed with simple hinged fronts, the second with framed detailing, wooden overlays, lighting and internal drawers. Comparing them by price per linear metre is pointless: the construction, components, finish and labour intensity differ. To understand the cost of a furniture project, you first need to separate the fee for design work from the cost of the furniture itself, and then compile a specification of parts and operations. It is precisely the absence of such a specification that turns a preliminary proposal into a set of figures that cannot be verified.
A practical starting point is not a photograph of a wardrobe you like, but three related documents: a plan with the actual dimensions of the room, a list of the furniture's functions, and a schedule of materials, decorative elements and operations. Each document answers a separate question. The plan shows whether the furniture will fit and whether its doors will open. The list of functions determines the number of sections, drawers and mechanisms. The schedule lets you find out which items make up the final price and what exactly will be manufactured.
The decorative part deserves its own line. A carved wooden overlay, a moulding for the front, a furniture leg and a finish may each look like small decisions on their own, but they affect dimensions, assembly method, painting and installation sequence. Using proven STAVROS products as examples, we will go through the quantity calculation and the cost of a set without substituting an advertising figure for a real budget.
Which documents turn a furniture idea into a verifiable project
A sketch, a working drawing and a specification serve different purposes
The sketch is responsible for the look. It shows the proportions of a tall wardrobe, the placement of glass doors, the character of the carving and how the fronts relate to the wall panels. But a beautiful sketch does not determine the thickness of each panel, how it is fastened, where the wiring goes or the permissible dimensions of a pull-out drawer. That is why a single image cannot honestly confirm the final manufacturing cost. A presentation picture is suitable for agreeing on a direction, not for replacing the construction.
A working drawing must contain the dimensions of the item, references to the floor and walls, the composition of the modules, the opening direction, technological clearances and the position of equipment. For furniture made after renovation, it is critical to state from which level the measurement was taken: from the bare wall or the finished surface. A change in the finishing thickness can disrupt the geometry of the niche. If the wardrobe is designed before the final finishing, the working drawing records the design dimensions and separately notes which values are subject to re-measurement before manufacturing.
The specification translates the drawing into items for purchasing and production: carcass panels, fronts, hinges, runners, handles, decorative parts, glass, light fittings, cable channels, fasteners, finish. It states the name, quantity, units of measurement, the chosen version and the price or clarification status. For a serial decorative item, the article number and a link to the product page are added so that similar ornaments are not confused.
Where the boundary lies between design and manufacturing
Layout development, sample selection, drawings and visualizations may be paid for separately or included in the manufacturer's commercial proposal. This boundary is determined by the terms of the specific contract, not by the general name of the service. Therefore, the question "how much does a furniture project cost" requires clarification of the deliverable: whether it concerns a consultation, a layout, a set of working drawings, or the order amount together with manufacturing. A useful reference for comparison is the CONCEPT material on how it is determined cost of a furniture project and what line items make up the calculation for a kitchen, a cabinet and a walk-in closet.
To verify a commercial proposal, ask for a list of the files and approvals to be issued. If only the visualization has been paid for, you cannot expect a full set of drawings for another production after it without an additional agreement. If manufacturing has been calculated, make sure that the price reflects the decorative elements shown in the image, not generic equivalents. This approach protects both the customer and the contractor: the subject of payment becomes unambiguous.
Start not with the facade, but with the measured floor plan of the room
What to measure before choosing cabinets and wall panels
Built-in furniture works in a space where perfectly parallel walls are rare. Measure the width of the niche at the bottom, middle and top, the height at several points, the depth taking into account the finish, the position of the skirting board and protruding utilities. For a door, the distance from the carcass to the reveal, the switch and the adjacent object is important. When planning tall sections, record the level of the finished ceiling, ventilation grilles and places where electrical wiring cannot be relocated.
The minimum measurement should not be taken as the automatically correct carcass width. It only shows the narrowest section. Next, the designer decides how to arrange the technical gaps, filler panels and junctions; the value depends on the geometry of the object and the installation method. If the cabinet is to look built-in, the filler strips and their finish are noted as a separate line. An unaccounted filler strip can lead to an unexpected difference between the price of the sketch and the final invoice.
For a kitchen, the list expands: water supply, drainage, sockets, extractor hood, ventilation, dimensions of the selected appliances, window sill height and radiator location. When planning facades in a classic style, it is advisable to check right away whether the protruding decorative frames will catch on the handles of the adjacent module, the reveal or the wall. The arrangement of a beautiful corner kitchen here depends not on the ornament pattern, but on the trajectory of the door.
How to preserve the agreed geometry during renovation
It is convenient to mark the source of each dimension on the plan: "measured on site", "design value", "appliance dimension from the datasheet", "to be confirmed after finishing". Do not merge these groups into a single table without labels. A confirmed washing machine width and an assumed finished wall depth have different levels of reliability. If a carcass is calculated based on an assumption, this must be visible before production starts.
Connections to utility points are documented on a separate layer: a cabinet may conceal an outlet, but must not make it inaccessible for servicing; lighting needs a cable route and access to serviceable components. In niches with an uneven floor, provide adjustable feet or another structural solution rather than trying to level the geometry by adjusting the thickness of a decorative moulding. When accepting a measured plan, it is useful to walk through the room and match each dimension to a visible reference point — a wall corner, an opening mark, a duct box, or a utility outlet.

How to create a functional brief for different rooms
Wardrobe: useful storage matters more than a decorative pattern
Instead of a vague request for "a large wardrobe", it is useful to list specific groups of items. Long outerwear requires a different section height than folded T-shirts. Suitcases and seasonal boxes can be placed at the top, but access to them will be infrequent; drawers for everyday small items should be located where they are convenient to use. The internal fit-out determines the number of dividers, runners, and hinges, and therefore the estimated price. The height of a decorative overlay on the front must not conflict with the handle line or the opening system.
Hinged doors and sliding systems are not simply two design options. The former require a clear opening sector, the latter require space for runners and overlapping panels. With the same external depth, the usable space may differ. For a wardrobe with mirrored doors, separately check the weight and permissible panel dimensions against the documentation of the manufacturer of the selected system. It is impossible to assess the required hardware from a photo of the front where the mechanisms are not visible.
Kitchen: work routes first, then colour and texture
A kitchen project starts with a list of appliances, storage methods, and work operations. If tall larder units, an integrated dishwasher, lighting, and floor-to-ceiling cabinets are required, all these solutions change the specification and installation locations. The sink area must provide access to connections for servicing; doors must not block the movement of pull-out drawers in the adjacent module. For glass fronts, the type of glass, the retention method, and the permissible frame construction are important — a general picture with lighting does not show these parameters.
Volumetric carved decor in the kitchen should be chosen more carefully than on a freestanding chest of drawers. Near the hob and sink, surfaces are cleaned more often, and joints, deep grooves, and protrusions can make maintenance more difficult. If a ready-made kitchen unit is designed for smooth surfaces, decorative elements cannot be added at the final stages without checking opening and coating. For a modern-style kitchen, sometimes one expressive niche or a pair of overlays on the buffet section is enough — this is a design alternative to decorating all doors.
Living room: furniture and architectural decor should not compete
In a living room, storage, a TV area, books, a decorative display cabinet and upholstered furniture are often combined. This is where the problem of incorrect scale is especially noticeable. On a small cabinet, a large ornament visually overwhelms the entire composition, while on a wide facade, too-fine carving gets lost. Before ordering, it is useful to lay out the decor on a front elevation drawing, showing the real dimensions of the items rather than enlarged schematic icons. STAVROS has for this task Wooden decorative inlays with various dimensions, and for a set with furniture, the overall logic of placement is important.
For the TV area, equipment ventilation, access to connections, space for sockets and the ability to remove the panel for servicing are calculated in advance. The decorative frame around the TV should not turn into a fixed structure that blocks technical openings. If the project includes both wall paneling and carved facades, it is useful to leave one leading accent: otherwise both surfaces become too active and difficult to perceive.
The materials of the carcass, facades and decor should be chosen separately
The carcass and the facade perform different functions
Buyers often formulate their choice in one word: "I want oak" or "I want matte white." But the furniture carcass, the visible door, the edge banding, the frame and the carved overlay can be made of different materials and require different finishing technologies. For the carcass, construction and geometric stability are important; for the door, the permissible weight, the behavior of the coating, and the method of attaching the handle; for the decorative item, the relief, the quality of surface preparation and compatibility with the base according to the specific installation technology.
One should not draw a conclusion about the durability of the entire cabinet from the wood species of a single overlay. An item made of beech, installed on a facade made of another material, does not turn the entire piece of furniture into solid wood furniture. Likewise, a painted decorative part made of wood is not identical to polyurethane stucco or plastic: the structure, requirements for the base and care regimen differ. It is important to record this in the estimate, otherwise offers from different workshops will look the same only because both use the word "decor."
When to choose beech and when to choose oak
In the STAVROS catalog, specific carved overlays are available in beech and oak versions. The choice is not only about price: with a clear or tinted finish, the texture and character of the wood become noticeable. When painting with opaque enamel, the quality of surface preparation agreed with the contractor may be paramount. One should not automatically assume that any species is suitable for any painting technology or promise a seamless joint without verification. The final order of priming, painting and installation depends on the selected materials and the recommendations of the coating manufacturer.
A single product code may have several sizes and sanding levels. These are not interchangeable items: a change in dimensions can change the composition of the facade, and a difference in surface preparation means a different scope of work for the finisher. For an estimate, you need to record not "overlay N-001" but "N-001, specific size, wood species, sanding, preparation option for finishing". Otherwise the customer sees one product code while the craftsman is quoting for different executions. The difference is especially significant when elements are repeated on several doors.
Coating and fastening must be present in the schedule
A carved overlay is not a finished painted door. Between buying a wooden part and installing it on the facade, fitting, preparation, painting, coating protection and careful fastening may be required. The cost of these operations depends on the actual technology and the number of parts. The specification must separately show whether they are included in the furniture maker's price or are performed by an outside craftsman. If the item is decorative, it is not assumed that it can automatically function as a load-bearing element, a handle or an additional door fastening.

Seven real STAVROS overlays for different facade scales
For a substantive comparison, seven items were selected from the STAVROS catalogue of carved wooden decor and the overlays section. All data below refer to the smallest specified execution in beech with "Standard" sanding quality and "Under enamel" preparation; prices were checked on the official product pages on 23 November 2026. These are prices for individual decorative items, not the cost of furniture, painting or installation. Some product codes also offer other sizes, wood species and preparation options; their prices should be opened in the corresponding product page.
| Product code and card | Size of the selected execution, mm | Price per piece, ₽ | Which compositional technique to consider it for |
|---|---|---|---|
| N-001 | 70 × 70 × 11 | 1 460 | Small local accent |
| N-002 | 140 × 77 × 12 | 1 800 | Elongated horizontal decor |
| N-093 | 80 × 185 × 9 | 1 410 | Vertical accent |
| N-106 | 311 × 70 × 8 | 2 140 | Linear accent insert |
| N-372 | 120 × 75 × 10 | 1 250 | Compact paired arrangement |
| N-414 | 307 × 154 × 16 | 3 710 | Larger decorative center |
| N-506 | 12 × 205 × 5 | 950 | Narrow vertical stroke |
Why you shouldn't choose an applique by lowest price alone
When choosing a decorative element, price is assessed together with size and number of repetitions. A small applique does not always replace a large one: on a 600 mm wide front, a 311 mm long piece occupies more than half the width, while a 70 mm long part takes only about one ninth. These proportions are not a standard of beauty; they show why precise dimensions are needed for a preliminary drawing. Relief depth also matters: the protrusion may end up in the opening, passage, or handle mounting zone.
The character of the ornament is assessed at actual scale. A good practice is to print a frontal drawing of the front and overlay the silhouette of the selected part on it while preserving dimensions. For paired placement, check whether the item is symmetrical or whether separate left and right versions exist. You must not automatically mirror the carving unless such pairing is stated in the product card. For corner joints of moldings, do not assume compatibility with any decorative corner just because both items are in the same section of the website.
How to verify the product card before ordering
Open the item, record the exact designation, dimensions, material, surface finish and price of the selected option. Then indicate the installation location and orientation method on the drawing. If a single article number is used for several fronts, check that the dimensions and coatings are identical. In the schedule, leave a column for the fitting result and approval of the fastening method. This check is especially useful in projects with an unusual combination of materials: wood and the substrate may have different processing requirements.

How to check that a decorative part physically fits the front
Geometry matters more than matching style
Let's take a hinged door 480 mm wide. On the sketch, a 307 mm wide overlay looks attractive. But the width alone says nothing about whether installation is possible. You need to check the distance from the edge to the handle, the thickness of the relief, the opening angle, the position of the hinges and the space for mounting hardware. If the front adjoins another leaf, the protruding pattern may enter its movement zone. A frontal drawing does not show this conflict, so complex decor requires at least one side section.
The expression "decor size" is sometimes understood as only the length of the ornament on the plane. In fact, the product card may contain three or four dimension designations, each of which is important. For N-001, for example, the size 70 × 70 × 11 mm is indicated with an additional parameter L in the product table; for N-106 — 311 × 70 × 8 mm in the basic version. The designations on the official drawing help to understand the direction of measurement. A single figure cannot be transferred to another drawing without defining the axes: an error is possible even with the correct article number.
For a front with a glass cutout, the width of the frame stiles is taken into account. The overlay must be placed on a solid base, not overlap the joint of thin parts as if it served as a structural tie. The area near the glazing bead and seal requires special attention: if the decorative part must be removed to replace the glass, the fastening method must allow this. Such nuances are discussed before the final finishing, because correction after painting affects the entire visible front.
Not every decorative overlay is suitable for a moving element
A door and a fixed side panel work differently. On the side of a chest of drawers, a volumetric overlay usually does not interfere with the mechanism's movement, but it may protrude into the walkway. On a hinged door, it takes part in daily movement and increases the weight of the leaf. On a pull-out drawer, the hand position, grip method and surface cleaning zones are important. If the part is long or massive, its safety and admissibility of installation are determined by the designer of the selected furniture, taking into account materials and fastening.
Do not use a decorative overlay instead of a handle unless the manufacturer positions it as functional hardware. Do not cover hinge fastenings or adjustment elements that will need access with it. When designing handleless cabinets, check the grip line before adding a carved ornament to the same edge. Sometimes the best solution is to move the decor to a fixed false panel: the visual effect is preserved, and the opening mechanism remains simple.
Calculating the number of overlays from the façade schedule
First number the façades, then multiply the quantity
Suppose the project has six hinged façades: two tall doors of the wardrobe group and four short cabinet doors. If the designer has specified two identical overlays on each tall door, that gives four elements. For the short doors, one element each has been chosen — four more. In total, eight parts are needed, but they cannot be combined into a single line before checking the article numbers: tall and short façades may use different sizes. Assign each façade a designation Ф1–Ф6 and specify the article number, finish variant, placement coordinates and quantity.
If an overlay is symmetrical, four identical elements may be acceptable; if left and right versions exist, two positions will arise instead of one. This should be established from the product card or the manufacturer's confirmation. For centring on the façade, record not only the distance to the edges but also the base axis. After changing the door width, the old offsets cannot be kept without recalculation: the composition will shift even if the article number remains the same.
The general formula is simple: the quantity of each article number equals the number of installation points on one façade multiplied by the number of identical façades, plus a separately agreed reserve or spare items. A "10% reserve" is not universally applicable to piece decor. With two items, such a percentage does not even yield a whole part; with seven parts, the need for a spare depends on the batch, finishing risks and the conditions for a possible reorder. The reserve is agreed in units with an explanation of the reason, not hidden in an arbitrary coefficient.
How to format the table so that it is accepted for work
The schedule must be linked to the drawings. The line "overlays for the cabinet — 6 pcs." does not say where to place the elements or what size they need to be. A working line contains the façade code, the number of façades, the number of elements on each, the article number, dimensions, material, surface preparation and the total quantity. It is useful to add a note about symmetry and pattern orientation. If a change of article number is permissible only after approval, this is also recorded: a visually similar ornament may have different dimensions and relief.
Decorative elements for walls, ceilings and furniture are recorded in a separate schedule. This is necessary when the interior combines boiserie and carved façades: a wall moulding and a door overlay may be aesthetically related, but they are purchased, painted and installed according to different rules. Mixing these lines often leads to confusion when distributing work between the furniture maker and the finisher.

Estimate by specific article numbers: two calculation scenarios
Example A: a restrained wardrobe with small accents
Let's imagine a hypothetical project where two tall fronts each have one N-106 overlay, and four small fronts each have one N-372. Two N-106 items in the base version at 2,140 rubles each give 4,280 rubles. Four N-372 items at 1,250 rubles each give 5,000 rubles. The total price of the overlays themselves is 9,280 rubles. This is the arithmetic part of the training example; the aesthetic and technical compatibility of this particular placement must be verified against the actual drawing.
If one N-001 is additionally planned for each of the same two tall fronts, two parts at 1,460 rubles each will add 2,920 rubles. The new cost of the decorative items will be 12,200 rubles. The example shows that the decision to add a small accent changes the budget not by some abstract "few percent" but by a specific line item. At the same time, the estimate still does not include the cost of door production, carcass cutting, hinges, finishing coat, preparation of the overlays, their attachment, and delivery. 12,200 rubles cannot be called the turnkey cost of finishing a finished wardrobe.
This calculation is convenient to use as a test for different artistic options. First, it is worth agreeing on whether additional N-001 items are needed: sometimes the main composition is already complete with two long lines and four compact parts. If there is no visual benefit, reducing the decorative schedule also reduces both costs and the number of finisher operations. The savings arise from an actual change in the configuration, not from abandoning the mandatory surface preparation.
Example B: a decorative group for a display cabinet or sideboard
Another hypothetical option is four N-002, two N-414, and six N-506. According to the prices published on the verification date: 4 × 1,800 = 7,200 rubles; 2 × 3,710 = 7,420 rubles; 6 × 950 = 5,700 rubles. Total 20,320 rubles for three groups of overlays. The quantity is chosen solely to demonstrate the structure of the estimate. It is not a finished project, a factory set, or confirmation that the listed ornaments are compatible with each other on a single facade.
Why is such a conditional estimate useful? Because it makes it easy to check exactly where the price will change when the decor is replaced. If six narrow N-506 are removed, the purchase amount decreases by 5,700 rubles. If they are kept but the facade finish is changed, the price of the parts themselves in the selected finish does not change in such a table, but the finishing work must be recalculated. If oak or a different overlay size is required instead of beech, the price of the new option is taken from the product card rather than multiplying the old amount by an arbitrary markup.
When comparing offers from two manufacturers, one may include painting of the overlays in the total cost of the facades, while the other may list it as a separate line. Comparing only the line "decor — 20,320 rubles" is meaningless: it describes the purchase of the selected parts, not the finished result. The full budget must be read together with the contract, the finish specification, and the installation terms.
Control arithmetic table
| Item of the conditional set | Quantity | Price per piece, ₽ | Amount, ₽ |
|---|---|---|---|
| N-106, beech, "Standard" | 2 | 2 140 | 4 280 |
| N-372, beech, "Standard" | 4 | 1 250 | 5 000 |
| N-001, beech, "Standard" | 2 | 1 460 | 2 920 |
| Total, example A with additional decor | 8 | — | 12 200 |
| N-002, beech, “Standard” | 4 | 1 800 | 7 200 |
| N-414, beech, “Standard” | 2 | 3 710 | 7 420 |
| N-506, beech, “Standard” | 6 | 950 | 5 700 |
| Total, example B | 12 | — | 20 320 |
This table deliberately does not combine the two options into a single “average budget.” They address different compositional tasks. To compare alternatives, one should evaluate the finished visual schemes rather than choose the minimum amount from incomparable sets. If the project involves fitting the product on site, the need for such processing is agreed separately: the geometry of the factory ornament should not be changed without verifying that this is permissible.
Why the amount of linear stock cannot be calculated with a single division
Total length and actual cutting are not the same thing
Profile elements are often used in a framed facade. It seems that it is enough to add up the lengths of all sides and divide by the length of one strip. But cutting has limitations: the saw cut angle, the profile direction, the maximum length of a continuous section, visible joints, and offcuts. As an example, let us take four rectangular frames with outer sides of 600 and 400 mm. Their total geometric perimeter, without taking into account the saw cut and the profile cross-section, is 4 × (2 × 600 + 2 × 400) = 8,000 mmthat is, 8 meters.
Let us assume, purely for an arithmetic exercise, that a profile 2,000 mm long is chosen, available without stock restrictions. Dividing 8,000 / 2,000 gives four strips. However, this result is not sufficient for ordering. If the manufacturer cuts individual blanks with allowance for joining and trimming, for example 620 and 420 mm, each frame requires two long and two short pieces; four frames will require eight 620 mm segments and eight 420 mm segments. Their total length is 8 × 620 + 8 × 420 = 8,320 mm, so four two-meter strips no longer cover the volume. A minimum of five will be required if a suitable cutting plan allows all segments to be accommodated.
Now let us check the placement: one 2,000 mm strip accommodates, for example, two 620 mm segments and one 420 mm segment — 1,660 mm before accounting for the saw kerf; 340 mm remains. But this option does not provide enough short segments if repeated on all five strips. A real cutting map must be drawn up, rather than limiting oneself to the sum. For each profile, the length of the blanks, the joining method, and the allowances are confirmed by the contractor. In this example, the frame and allowance figures are conditional, not recommendations for cutting a specific STAVROS moulding.
The cutting map is checked together with the visual pattern
Some profiles have a pronounced ornament direction. With a mirrored layout, the face parts must be oriented consistently, otherwise after cutting it is impossible to simply swap a piece from one frame to another. Additional restrictions may arise from a defect in the blank, wood characteristics, or requirements for pattern continuity. For relief elements, the joint is important: even perfectly calculated millimeters do not guarantee an invisible connection. Therefore, when purchasing decoration for moldings verify the compatibility of the selected profile with the corner and center pieces on the drawing, not by similarity of names.
If a furniture project includes both solid wood trim and facade overlays, the estimate is calculated in different units. Mouldings are usually counted by strips or lengths of a specific finish, overlays — by pieces. The cost of the material is supplemented by cutting, end processing, joining, and finishing operations, if provided. An option with a large number of short frames may result in higher consumption of blanks and labor than one long decorative line with a similar total footage.
Full cost of a furniture project: how to assemble a single estimate
Break costs into clear groups
A clear estimate is built not around room names, but around verifiable work and components. The first group is project preparation: measurement, layout planning, approval of the functional brief, drawings and, if provided for in the contract, visualisation. The second is the main furniture items: carcass, fronts, supports, interior fittings. The third is hardware and equipment: hinges, runners, lift mechanisms, lighting and its components. The fourth is external decor and finishing: wooden overlays, mouldings, preparation, painting, fixing. The fifth is logistics, assembly and installation on site.
This breakdown does not mean that every company must issue five separate invoices. Its purpose is to check that the proposal is complete. The contractor may combine production and assembly into a single price, but the client needs to understand whether they are included in the obligations. The total cannot be considered final if delivery is described as "at the carrier's rates" without stating how it is calculated and the handover terms, or if the painting of decorative elements is not mentioned at all in the annex to the contract.
To compare several estimates, fix a single baseline specification. If one manufacturer prices fronts with wooden overlays while another offers plain doors, the difference does not mean the second is cheaper for the same result. You should ask for a separate alternative with the same number of doors, mechanisms, materials and decor. Once the conditions are aligned, comparing prices, lead times, responsibility for installation and the procedure for correcting defects becomes far easier.
Where double counting hides
In complex projects, a common logical error is charging for the same work twice. For example, painting the fronts is already included in production, while a separate line for "decor finishing" contains both re-painting the entire front and treating the overlay. These may be different production operations, but the estimate must explain the difference. Ask them to state which surface is treated and at what stage. A similar problem arises when delivery from the factory to the warehouse is included in the price of the goods, yet the client is additionally charged for "delivery of the whole batch" without distinguishing the sections of the route.
The opposite error is omitting a necessary operation. The overlay was purchased, but no payment was provided for colour matching and careful installation. The hardware is included, but there is no adjustment after installation. The lighting appears in the visualisation, but the estimate forgets the serviceable power supplies and mounting profiles. To identify such gaps, it helps to go through each visual element and ask: "Which specific line is responsible for this result?" If there is no answer, the project needs clarification before the price is agreed.

How to compare workshop proposals without swapping the specification
Compare the same result, not similar pictures
Let's imagine that two workshops received the same sketch of a display cabinet with lighting and carved overlays. The first offers facades with decorative wooden elements, the second offers smooth frames and leaves the ornament only in the visualization. Formally, both proposals are called "display cabinet per project", but their cost does not have to match. Before comparing, check not the final figure but the composition: how many doors, what the dimensions are, whether lighting is included, what the frame material is, how many carved parts there are, and whether the finishing coat and installation are included. If even one of these items differs, draw up a list of discrepancies and request comparable options.
In a commercial estimate, it is useful to assign a version to each proposal. Changes such as "install a soft-close mechanism instead of standard hinges" or "add two decorative elements" should generate a new revision rather than be corrected verbally. Small changes at the level of a single door affect hardware orders, facade dimensions and the painting route. After the project is approved, ask the contractor for a summary table of changes and the final specification. Without it, a month later it can be difficult to establish exactly which configuration was agreed.
When a manufacturer lists "furniture project price" as a single line, it is necessary to find out what is being paid for: the designer's work, a set of drawings, material selection or furniture manufacturing. The wording "furniture design price list" does not replace an individual technical specification: a consultation price list does not contain the price of future wardrobes, and the overall furniture budget does not explain the cost of preparing drawings. For a clear comparison of expenses across an apartment, the methodology from the CONCEPT guide is useful, planning custom furniture for the entire apartment, where layout, materials and phasing are considered together.
Checking additional work before signing documents
Ask them to list the work performed directly on site: delivery to the building entrance or to the room, lifting of large items, assembly, wall junctions, facade adjustment, connection of lighting by a qualified specialist, removal of packaging and disposal of leftovers, if this is provided for at all. The words "installation included" may cover a different set of actions. If the contractor does not connect electrical equipment, this is not a defect in the proposal, but responsibility and the scope of work must be clear in advance.
Check whether the material can be replaced without changing the agreed price, and on what basis. For example, replacing beech with oak for wooden overlays should go through a new product line with a specific price. The phrase "similar hardware" deserves the same attention: a functional equivalent does not always match in load capacity, dimensions and the possibility of further adjustment. At the comparison stage, it is more economical to ask these questions than to find out after manufacturing that the parts are not interchangeable.
Choosing furniture: what information to prepare for a consultation
A package of initial data reduces the number of reworks
For the first meeting, it is useful to prepare a floor plan, photos of the walls with utilities, a list of essential items, examples of facades you like and a budget guideline. At the discussion stage, it is not necessary to know the professional name of every hinge, but it is desirable to separate essential functions from wishes. For example, "the wardrobe must accommodate long coats and a suitcase" is an essential function; "we would like decorative overlays on all doors" is a style preference that can be discussed after the main structure has been calculated.
If you are interested in furniture selection, the price of such selection depends on whether it is a consultation on the ready-made range, a full layout development, or individual design. These services cannot be combined under a single figure without describing the result. CONCEPT has published an article on how it takes place furniture selection and what questions to prepare for the first meeting in the showroom: it is useful when discussing samples, measurements, materials and approvals. It can be used as a checklist, not as a promise of a specific consultation price.
The customer should indicate in advance who will use the furniture and how often. A tall wardrobe for seasonal storage has one set of access requirements, while a daily-use kitchen has another. For a children's room, stability, accessible storage and safe use are important, not the complexity of the decorative pattern. For furniture in a rented apartment, a collapsible design and the possibility of subsequent transportation may be a priority. A specification fulfils its purpose only when it reflects the real usage scenario, not a random set of attractive items.
How to discuss price without substituting content with haggling
During the consultation, it is useful to ask which items create the greatest difference between the two options. Instead of requesting "make it cheaper", compare the door construction, interior fittings, hardware quality, finish type, number of decorative details and installation procedure. Reducing the number of carved elements may be an acceptable aesthetic choice. Omitting necessary fasteners, incompatible mechanisms or an unacceptable reduction in the rigidity of the cabinet body is no longer a way to optimise the budget. The boundary between replaceable and mandatory elements must be explained constructively.
It is convenient to divide the agreed budget into stages: first the working construction, then the necessary hardware, then the decorative finish. This does not mean that finished fronts can be endlessly upgraded with carving. Some decisions must be made before manufacturing because they affect dimensions, painting and fasteners. Staging concerns primarily approvals and payments; the technical compatibility of all future elements must be checked at the start.
How to unite furniture for the whole apartment with a common decorative solution
A single palette does not mean identical carving everywhere
The buyer often wants the kitchen, hallway and living room to look like part of one interior. The most direct way is to repeat the same fronts and handles in all rooms. But it does not always suit the functions: kitchen surfaces are washed more often, the hallway has increased load from wet clothes and shoes, and in the living room a visual accent is more important. A common interior can be assembled using a recurring wood tonality, finish shade, simple frame proportions and a limited number of characteristic details. This is more flexible than copying a complex carved pattern into every room.
When a project covers an entire apartment, it is useful in the overall specification to separate the mandatory baseline from the decorative accents. The baseline describes the carcasses, opening direction and main surfaces. The accent line covers the selected overlays, furniture supports, panels and mouldings. This makes it possible to move an expensive decorative element from a barely visible area of the wardrobe to the display cabinet facade, where it is better perceived, without changing the entire furniture construction. This approach saves not only material but also the viewer's attention: each room acquires its own compositional role.
To compare local solutions, suitable CONCEPT pages — custom wardrobes in Stavropol и custom kitchens in Stavropol. These pages present different functions and facade options. When moving from one room to another, it is important to keep the overall map of materials and dimensions, but to agree separately on the construction and cost of each product group. A scheme designed for a sliding-door wardrobe does not automatically become suitable for a kitchen section with built-in appliances.
What to do with legs, handles and door frames
On a freestanding cabinet or console, the supports play a prominent role. They simultaneously bear the load and contribute to the design of the piece. When choosing wooden furniture legs and supports first check the structural purpose, dimensions, connection type and permissible load for the specific product, and only then select the ornament to match the facade. Not every carved leg can replace the standard support of cabinet furniture; an independent modification may compromise stability and geometry.
It is useful to mark handles on the facade drawing at full size. Sometimes they are precisely what determines where carving can go: an ornament cannot be applied where the hand must freely grip the handle or where a through fastening is located. When selecting door frames, the position of hinges, glazing beads and fastening screws must be checked separately. An agreed collection of decorative elements does not remove these functional constraints; a good project combines aesthetics and construction without assuming that one replaces the other.
STAVROS order: specification, execution check and delivery
How to submit a request for a complete decor set
Once the drawing and the specification sheet are ready, all you need to place an order is to give the seller the item codes and exact options: dimensions, wood species, surface preparation level, quantity and, if relevant, the finishing method to be applied afterwards. For several dozen small elements, a file with a list is more convenient than reading them out verbally. Separately attach questions about compatibility if the elements are to form a single framed composition. Answers to these questions cannot be derived from product photos alone, even if the samples look similar in color and ornament.
A page has been published on the STAVROS website of design project development. Before ordering such a service, clarify the scope of work and whether it applies to your task: a whole-room project, decor selection, or technical development of individual elements are different scopes. If the furniture is being designed by another workshop, allocate responsibility for measurements and checking fastenings in advance. The manufacturer of a single decorative overlay cannot confirm, based on one item code alone, that the entire wardrobe is suitable for installation.
Check the terms for receiving the items on the current STAVROS page "Payment and Delivery". The estimate should state the locality, the delivery method and, if there are several contractors, who receives and inspects the shipment. Do not plan installation on the assumption that all items are in stock at a particular warehouse: availability and lead time may vary by size, species and finish. The current status of the selected variant is checked when placing the order.
What to check when receiving decorative items
Check the number of packages and ordered items against the documents, then check the item codes and selected variants against the specification sheet. Inspect the surfaces available for checking, the geometry and the integrity of the relief in accordance with the seller's and carrier's acceptance terms. If the item is intended for painting, it should not be assessed as an already fully painted part: what matters is the condition of the preparation you ordered. Note any discrepancies before installation so it is clear at which stage the problem was found.
For a large batch, it is advisable to keep at least one copy of the approved facade layout at the work site. The installer must know not only the number of parts but also their orientation and axial references. Installing "by eye" from a general photo may look acceptable on one facade and show obvious asymmetry on the adjacent one. If the furniture manufacturer has not agreed the fastening and finishing technology in advance, this work cannot be considered automatically included in the delivery of carved items.
Installation, care and the possibility of repair after installation
Check the surface and the order of operations
Before fixing decorative elements, make sure that the base has been prepared according to the chosen technology, that the product does not obstruct opening, and that its position matches the approved drawing. There is no universal adhesive or universal fastening scheme for all combinations of wood, painted MDF and other substrates. Clarify the recommendations of the material manufacturer, the furniture designer and the finisher. Take particular care with parts that will be painted after installation: the color and texture must remain consistent, and access to the hardware must remain unobstructed.
When joining elements with different properties, avoid rigid unverified solutions that could damage the coating or the substrate. The overlay must not conceal a structural defect in the door. If the front has warped, the cause may be the hinges, the load, the adjustment or the condition of the cabinet; adding a decorative element will not fix anything. In the maintenance plan, it is useful to keep information about article numbers and finishes: this makes it easier to find a suitable part if damaged.
Cleaning depends on the finish
Deep carved relief is harder to wipe than a smooth surface. Therefore, in kitchens and hallways, assess in advance how accessible the grooves are for care. Choose the cleaning method based on the actual coating and its manufacturer's recommendations, not on the name of the decorative part. Do not use abrasives or aggressive chemicals without confirmation of their compatibility with the surface. For furniture near heat and moisture sources, what matters are the actual operating conditions, not a general promise that "wood is suitable everywhere."
Maintainability can also be planned. On a front that is frequently removed for access to equipment, complex applied decor creates an additional risk of damage during removal. If you provide in advance for the possibility of removing the panel, replacing the hardware and selecting a separate decorative item, maintenance may be simpler. Keep a working version of the specification and photos of the installed solution: they are more useful than remembering what the product was called at the time of ordering.
Five estimate mistakes that only come to light after work begins
The first mistake is substituting the cost of furniture with the cost of design, or vice versa. The customer asks how much the whole set costs, but receives the price of a consultation or a preliminary sketch. Check: the response must state the result of the work and the list of products included in the amount. If the type of proposal is unclear, comparing it with other workshops is premature.
The second mistake is calculating the number of decorative parts by the area of the fronts. Area is useful when estimating certain types of materials and work, but piece carved overlays are counted by installation locations. Check: each front must show positions with article numbers, and the total in pieces must match the table. The difference between six and eight identical parts does not depend on the door area.
The third mistake is hiding different versions under one name. N-106 in the smallest size and N-106 in the next size have different dimensions and prices. Check: each order line must include exact dimensions, wood species, sanding and surface preparation option. You cannot verify an estimate by article number and total amount alone.
The fourth mistake is that the visualization shows a decorative pattern, but the estimate does not include preparation, finishing, or installation of the corresponding parts. Check: every solution shown has a contractor, a material, and a responsible stage. If the work is distributed among several organizations, their boundaries are documented in writing.
The fifth mistake is that approved changes do not make it into the final schedule. At the meeting it was decided to add lighting and replace the handles, but the working file still contains the old version. Check: along with the final price, the customer receives an up-to-date list of products and drawings with the revision marked. Otherwise, even with careful production, a configuration other than the one the customer expects may be manufactured.
Questions worth closing before final approval
Should a sample of the decorative overlay be purchased before ordering the entire batch?
For a complex combination of relief, coating, and facade material, a sample can be useful. It allows you to check the real scale, the preparation method, and the impression of the ornament under normal room lighting. But a sample of one wood species and finish cannot automatically be considered confirmation of another. If you are comparing options, note exactly what was checked: the shade after finishing, the acceptability of fastening, the accuracy of the pattern, or the tactile properties. The decision on a trial purchase depends on the cost of an error and the complexity of the project.
What should be done if the niche size changed after the project was approved?
Require that the changes be reconciled with the working drawings before production starts. Sometimes it is enough to adjust the filler strip, but the change may affect the width of the cabinet, the sections, the door, and the coordinates of the overlays. The old and new versions must be compared by specific parameters, and the price must be re-approved if materials or work change. A verbal promise to "fit it on site" does not state which parts will be changed or at whose expense.
Can facade preparation be left to one contractor while the carved decor is ordered separately?
Yes, if responsibilities are agreed upon and the compatibility of materials and stages has been verified. The furniture maker must know the thickness and dimensions of the overlays, the finisher must know the chosen coating technology, and the installer must know the fasteners and placement. The specification becomes a shared document for the participants. If any of them works from an outdated sketch, the appearance may differ even though the products themselves were manufactured without defects.
What materials should be kept after the furniture is handed over?
A useful final drawing with the revision, a list of hardware and decorative items, information about the finishes used, order documents and service terms. Close-up photographs record the orientation of the carving and the pattern of the finish. When repairing or making an additional cabinet, this information helps reproduce the composition without guesswork, but it does not guarantee that the shade of a new batch will match the old one without prior verification.
How to complete the calculation and move to ordering without unnecessary rework
The final check consists of several questions about a single document. Are there measurements with clear sources of dimensions? Does the furniture's contents match real belongings and habits? Are the exact versions of the overlays specified, not just their names? Does the quantity in the table match the placement on the fronts? Are there separate lines for finishing, delivery, assembly and other mandatory work? Is the actual method for agreeing changes shown? If the answers are confirmed by the drawings and the schedule, the project gains a clear basis for discussing the price.
In projects with wooden carved decor, a verified product card is more useful than a promise to "make something similar". The seven STAVROS items reviewed provide specific dimensions and prices for the selected base versions, but the final set is determined by the drawing and the manufacturing technology. Decor is not chosen for the number of parts in the estimate: it should be noticeable in the right place, combine with the furniture and not hinder its use. Where a simple frame or a single accent is enough, a complex composition will only increase the number of operations.
If the question is, how much a furniture project costs as a preparatory step, check the list of documents to be issued separately from the manufacturing price. When ordering furniture, separate the discussion of the artistic image from the approval of the technical result. First confirm the construction and functions, then the composition of the decor and the finish, and after that — the final estimate and the responsibilities of the parties. This sequence helps to see the real price of each decision and to drop the unnecessary in time without compromising the required quality.